Skip to content
  • About Us
    • Home
    • About Editor -in-Chief
  • INTERNATIONAL
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
  • Excl. Interviews
  • Post your coverages
  • About Editor -in-Chief
  • Converse with Tarun – Exclusive Video interviews
  • Health & Fitness
    • Health & Fitness
  • Advertise with us
  • PSU
  • Diplomacy News
  • Events
TOP INDIAN BUREAUCRACY NEWS | SARKARIMIRROR

TOP INDIAN BUREAUCRACY NEWS | SARKARIMIRROR

India’s top bureaucracy news portal, read the latest insider from the world of bureaucracy, politics, PSUs, defence and corporate, updated round the clock

  • About Us
    • Home
    • About Editor -in-Chief
  • INTERNATIONAL
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
  • Excl. Interviews
  • Post your coverages
  • About Editor -in-Chief
  • Converse with Tarun – Exclusive Video interviews
  • Health & Fitness
    • Health & Fitness
  • Advertise with us
  • PSU
  • Diplomacy News
  • Events

Flash News

Ayurveda takes Root: AIIA and 132 ECO Task Force join hands to restore the Aravallis

SKF India (Industrial) Launches ‘Gram Unnati’ in Partnership with Ambuja Foundation to Pioneer India’s Next Model of IntegratedVillage Development Program in Bavla, Gujarat

GJC CALLS 67% HIKE IN GOLD HALLMARKING CHARGES UNWARRANTED; SEEKS IMMEDIATE REVIEW

Uttar Pradesh Government transfers 14 IAS officers.

Thursday, October 01, 2026

Tag: Uttaranchal

Total installed capacity of NTPC has increased to 41,684 MW
PSU

Total installed capacity of NTPC has increased to 41,684 MW

sarkarimirror October 9, 2013

Total installed capacity of NTPC has increased to 41,684 MW The total installed capacity of NTPC has increased to 41,684 MW with the commissioning of the Unit-VI of 500 MW … Read More

000 MW plus company by 2032.000 MW through its joint venture projects170 MW in a single year in 2012-132013. With this the total installed capacity of Rihand Super Thermal Power Project has become 3000 MW (6x500MW). The beneficiary states of NTPC684 MW The total installed capacity of NTPC has increased to 41684 MW with the commissioning of the Unit-VI of 500 MW of Rihand Super Thermal Power Project on October 7th7 gas based power stations and 7 joint venture / subsidiary power projects located across India. The company plans to become 128current newsDelhigovernment of india newsHaryanaHimachal Pradeshincluding 1Jammu & Kashmir and Chandigarh. With 18.4 per cent of India’s total installed capacityNTPCNTPC accounted for 27.4 per cent of India’s total power generation during 2012-13 underlining its consistently high operational efficiency. NTPC achieved highest ever capacity addition of 4ntpc newsPunjabRajasthanRihand power plant are Uttar Pradeshto provide further push to the growth momentum gained over the previous two years. NTPC operates with 15 coal basedTotal installed capacity of NTPC has increased to 41Uttaranchal

Tarun Sharma, Editor-in- Chief

October 2026
MTWTFSS
 1234
567891011
12131415161718
19202122232425
262728293031 
« Sep    

Informative Links

SGRH LOGO
dmrc routes and fares

INFORMATIVE LINKS

Proudly powered by WordPress | Theme: TimesNews | By Theme Freesia.