Skip to content
  • About Us
    • Home
    • About Editor -in-Chief
  • INTERNATIONAL
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
  • Excl. Interviews
  • Post your coverages
  • About Editor -in-Chief
  • Converse with Tarun – Exclusive Video interviews
  • Health & Fitness
    • Health & Fitness
  • Advertise with us
  • PSU
  • Diplomacy News
  • Events
TOP INDIAN BUREAUCRACY NEWS | SARKARIMIRROR

TOP INDIAN BUREAUCRACY NEWS | SARKARIMIRROR

India’s top bureaucracy news portal, read the latest insider from the world of bureaucracy, politics, PSUs, defence and corporate, updated round the clock

  • About Us
    • Home
    • About Editor -in-Chief
  • INTERNATIONAL
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
  • Excl. Interviews
  • Post your coverages
  • About Editor -in-Chief
  • Converse with Tarun – Exclusive Video interviews
  • Health & Fitness
    • Health & Fitness
  • Advertise with us
  • PSU
  • Diplomacy News
  • Events

Flash News

Rajesh Kumar IPS, appointed as the new DGP of Arunachal Pradesh.

Air Chief Marshal Ashutosh Dixit PVSM AVSM VM VSM, assumes charge as the 29th Chief of the Air Staff.

Brij Mohan Mishra IAS, tenure extended as Joint Secretary in the Department of Commerce for 6 months.

Honasa Consumer Limited Elevates Vipul Maheshwari to Chief Product & Technology Officer 

Saturday, November 07, 2026

Tag: NTPC LATEST POWER PROJECTS

NTPC TO GO AHEAD WITH SET UP OF 4000 MW POWER GENERATION PLANT AT RAMAGUNDAM
PSU

NTPC TO GO AHEAD WITH SET UP OF 4000 MW POWER GENERATION PLANT AT RAMAGUNDAM

sarkarimirror July 8, 2014

 New Delhi: NTPC Limited has agreed to set up 4000 MW Power Generation Plant at Ramagundam adjacent to their existing units as an expansion unit.  The Honourable Chief Minister assured … Read More

CMD Genco and Sri. S.Narsing Rao Prl.Secy. to CM are present in the meeting.cmd ntpccurrent affairsDirector (Operations)Director (Technical)government of india newsHyderabad thatindiaindia newsindian goevrnemntNew Delhi: NTPC Limited has agreed to set up 4000 MW Power Generation Plant at Ramagundam adjacent to their existing units as an expansion unit. The Honourable Chief Minister assured the NTPC ChairmanNTPCNTPC LATEST POWER PROJECTSNTPC NEW PROJECTSntpc newsNTPC TELANGANA PROJECTSpolitical newsPrl. Secretary Energy & CMD TranscoRegional Executive Director (South) have called on the Chief Minister. Sri.Suresh ChandaSri. R.VenkateswaranSri.A.K.JhaSri.D.Prabhakar RaoSri.N.N.Misrathe required coal linkage for NTPC plant will be taken up by the Telangana government with Government of India. He has agreed to provide the required land in Toto either from out of the available landwho called on him today at Secretariat

Tarun Sharma, Editor-in- Chief

November 2026
MTWTFSS
 1
2345678
9101112131415
16171819202122
23242526272829
30 
« Oct    

Informative Links

SGRH LOGO
dmrc routes and fares

INFORMATIVE LINKS

Proudly powered by WordPress | Theme: TimesNews | By Theme Freesia.