Skip to content
  • About Us
    • Home
    • About Editor -in-Chief
  • INTERNATIONAL
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
  • Excl. Interviews
  • Post your coverages
  • About Editor -in-Chief
  • Converse with Tarun – Exclusive Video interviews
  • Health & Fitness
    • Health & Fitness
  • Advertise with us
  • PSU
  • Diplomacy News
  • Events
TOP INDIAN BUREAUCRACY NEWS | SARKARIMIRROR

TOP INDIAN BUREAUCRACY NEWS | SARKARIMIRROR

India’s top bureaucracy news portal, read the latest insider from the world of bureaucracy, politics, PSUs, defence and corporate, updated round the clock

  • About Us
    • Home
    • About Editor -in-Chief
  • INTERNATIONAL
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
  • Excl. Interviews
  • Post your coverages
  • About Editor -in-Chief
  • Converse with Tarun – Exclusive Video interviews
  • Health & Fitness
    • Health & Fitness
  • Advertise with us
  • PSU
  • Diplomacy News
  • Events

Flash News

bsf

 Daljit Singh Chaudhary IPS accorded a warm farewell as Director General of the Border Security Force (BSF) on his retirement day.

Haryana Government in a major bureaucratic reshuffle transfers 20 IAS Officers

Bihar govt transfers 8 IAS officers.

Utpal Kumar Singh (Retd. IAS:1986:UK) gets another extension as Secretary General of the Lok Sabha.

Monday, December 08, 2025

Tag: 000 MW (5×800 MW) supercritical thermal power project from Telangana State Power Generation Corporation Limited (TSGENCO). Significantly

BHEL CREATES LANDMARK SECURES 4000MW CONTRACT FROM TSGENCO
PSU

BHEL CREATES LANDMARK SECURES 4000MW CONTRACT FROM TSGENCO

sarkarimirror June 3, 2015

BHEL CREATES LANDMARK SECURES 4000MW CONTRACT FROM TELANGANA STATE POWER GENERATION CORP. LTD. FOR SETTING UP SUPERCRITICAL THERMAL POWER PROJECT New Delhi: Bharat Heavy Electricals Limited (BHEL) has achieved a … Read More

000 MW (5×800 MW) supercritical thermal power project from Telangana State Power Generation Corporation Limited (TSGENCO). Significantly2014.950 Crorealso on EPC basisat Damaracherla in Nalgonda District in the stateat Kothagudemclose on the heels of placing two major orders on BHELfollowed by an order for the 4×270 MW Bhadradari TPS at Manuguru in Khammam district in March 2015.in Decembernamed as Yadadri Thermal Power Project. EarlierNew Delhi: Bharat Heavy Electricals Limited (BHEL) has achieved a new landmark by securing the single-largest order in its history for setting up a 4on Engineeringprocurement and construction (EPC) basisthe newly formed Telangana state utilitythis is also one of the highest value orders ever placed in the capital goods sector in India. NotablyTSGENCO had placed an order on BHEL for setting up Telangana’s first Supercritical Thermal Power Plant of 800 MW ratingTSGENCO has entrusted BHEL with this order for setting up the 5×800 MW thermal power plantvalued at at Rs.17with supercritical parameters

Tarun Sharma, Editor-in- Chief

tarun sharma editor

December 2025
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Nov    

Informative Links

SGRH LOGO
dmrc routes and fares
Screenshot 2020 07 08 10 21 51 637 Com.google.android.apps.docs
Proudly powered by WordPress | Theme: TimesNews | By Theme Freesia.